Sidewalks on both the north and south sides of University Ave. The over-winter configuration opened all travel lanes and turn lanes on University Ave. Traffic was changed into an over-winter configuration on December 2, 2023. project limits will continue throughout the winter months. Please note that BRT work that involves lane closures and traffic shifts will be taking place within the University Ave. The remaining work on the project is anticipated to be completed within an approximate two-month period once work is able to resume in spring 2024. Most of the remaining work in 2024 will take place in the medians of University Ave. Weather permitting, work on the University Ave. project will be removed from the roadway. project will be paused for the winter months and remaining traffic control devices related to the University Ave. Roadway work operations for the University Ave. Please see the link below for additional information on the BRT work that will be taking place over the winter months. on the south side of University Ave.īus Rapid Transit (BRT) work that involves lane closures and traffic shifts will be taking place within the University Ave. Temporary pavement markings will be installed at Schmitt Pl., Ridge St., and Franklin Ave. Please note temporary traffic signals will remain operational until all testing of the permanent signals is completed in January 2024. contractor will continue minor work operations on traffic signal components that are being installed at the intersections of University Ave.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |